Details Project
Client
Candido Jose Rodrigues
Scope
Engineering, Procurement and Construction (EPC)
Localization
Portugal
Implementation Time
26 Days
installed power
90 KW
Challenges //
Solutions
A tight timeline and difficult roof access conditions, this project involved careful study and analysis.
Projectscharacteristics
Solar panel
432 BYD 255P6C - 30
Switchstation
MV SwitchStation 15 meters
>
What we did
// Aluminum Roof Structures
// Installation of 432 PV Modules (255 Wp)
// Electrical Inverter Installation
// Earth Connections
// Electrical Cables and Connectors Installation
// Grid Connection
// Maintenance